Our businesses

Jersey Electricity Group consists of several complementary businesses beyond energy supply. Find out what else we do.

View All Our Businesses

Projects

A low carbon future is within our power. And it’s projects like these that’ll ensure a robust, reliable, low-carbon, sustainable electricity supply for generations.

View All Projects

Corporate Governance

Leadership

Discover who leads Jersey Electricity; meet our Board and our Executive Leadership Team.

About us Projects
Two men guide power cable off a reel

Planning our projects

We are proud to have kept pace with the increasing demand for electricity over almost a century. We plan 20, 30 sometimes 40 years ahead in projects that can cost millions of pounds.

Our three undersea supply cables to France are the foundation of a secure, low-carbon energy system that is the envy of many countries.

This energy platform gives Jersey access to almost limitless supplies of low carbon imported electricity and is entirely compatible with local renewables, which we are bringing on to the grid.

To ensure this power gets to your homes and businesses safely and reliably when you need it also requires a robust on-island distribution system.

Between 2004 and 2020, we have invested significantly in new primary substations and our South Hill Switching Station to form a robust 90kV double ring around the Island.

We are now turning our attention to new demand-side technologies to give our customers more control, choice and comfort than ever before.

Our recent projects

An image of the solar PV panels on top of the roof at La Collette power station.

Solar PV arrays

Learn more about our renewable solar projects and why we think solar suits our Island best.

Learn more
Neil Schofield installs Smart Meters

Smart Meter roll out

SmartSwitch is our £11m project to install the latest technology Smart Meters in every premise in the Island.

Learn more
A Jersey Electricity worker walks past the St Helier West substation.

St Helier West Substation

Opened in December 2018, the St Helier West Substation secures electricity supply to 80 per cent of St Helier homes and businesses.

Learn more
Three members of the Normandie 1 project team watch as Stemat arrives in Jersey.

Normandie 1

Our third 100MW undersea cable to France installed in 2016 serves around a third of the Island’s total annual power consumption with low-carbon electricity.

Learn more
Excavators on the beach lift the Normandie 3 subsea cable into place.

Normandie 3

Installed in 2014, Normandie 3 is an undersea cable that significantly enhanced Jersey's supply security and helped us double our import capacity of low-carbon electricity.

Learn more
South Hill switching station

South Hill Switching Station

South Hill Switching Station is the strategic hub of our 90kV network and the connection point for the Normandie 3 subsea cable.

Learn more
Engineers install a diesel generator at La Collette Power Station.

Sulzer diesel generators

Our project to install two refurbished 11MW Sulzer diesel generators to secure the Island's electricity supply during two energy-hungry winters.

Learn more
Roadworks

The BIG Upgrade

Find out about our biggest ever investment into our electricity network

Learn more

Normandie 1 documentary

The Normandie 1 marked a significant forward step in our subsea cable investment programme. This documentary was commissioned to celebrate the switch on.